Electrical Installation at Erbil Curtain Factory
The electrical installation project at Erbil Curtain Factory was successfully completed by BiHorns. The objective of the project was to establish electricity in the factory, with a focus on ensuring adequate lighting, proper distribution of electrical outlets, and elaborately distributing electrical loads for effective fire protection.
To achieve these objectives, our team implemented the following measures:
Installed lighting fixtures in a manner that ensured full coverage of the laboratory area without any blind spots left.
Properly distributed electrical outlets according to the placement of the electrical machines, ensuring compatibility with both 3-phase and mini-phase machines.
Elaborately distributed electrical loads to ensure proportional and safe use of electricity in line with the fire protection system.
In addition, we installed gas air conditioners in the office area to ensure a comfortable working environment for the staff. This was done in a manner commensurate with the size of each office, with appropriate amounts of gas for efficient air conditioning.
Our team of experienced professionals completed the project within a period of 25 days, ensuring that all equipment and resources were available as required. The Erbil Curtain Factory now has a reliable electrical system in place, providing a safe and comfortable environment for its staff.